STOCKADE STYLE LOG HOMES
NEW HOME ESTIMATE COST SHEET
Listed below are many costs associated with building a new home. This list is meant to help you develop an approximate cost for your new home construction. By getting quotes on all facets of the building process you will be better positioned to stay within budget. After you receive all quotes it is suggest to add an additional 10% for unknown costs and inflation on materials; for most quotes are only good for 30 days. Make sure costs include material, labour and installation.
This estimate cost sheet has been divided into three cost type sections: Administrative, Sub-contractor and Material. There is overlap amonst the themes but this design seems most fitting.
Administrative Costs
General Contractor
$
Lawyer Fees
$
Building Insurance
$
Power Company (poles/hock up charges)
$
Telephone (hook up fees)
$
Cable / Sat / Internet (hook up fees)
$
Appraisers (if necessary)
$
Location certificate & possibly other surveying costs
$
Construction Permits
Driveway permit
$
Building permit
$
Municipal Water and Sewer (hook up)
$
Other
$
Other
$
Administrative Costs subtotal
$
Sub-contractor Costs
Plumbing
$
Heating and Air Conditioning
$
Air Exchange (unit)
$
Electrical
$
Central vacuum or other
$
Drywall (hung & filled)
$
Paint and Stain
$
Chimney (Systems)
$
Drilled Well
$
Septic, Driveway & Excavation
$
Landscaping
$
Foundation work
$
Other
$
Other
$
Sub-contractor subtotal
$
Material Costs
Plans & Log Wall Package
$
Flooring (Hardwood, Carpet)
$
Lighting
$
Roof System (Rafters)
$
Kitchen Cabinets
$
Trim and Finish
$
Doors and Windows
$
Other
$
Other
$
Material subtotal
$
Total
$
Total with added 10%
$